Resource information
This Regulation determines the necessary conditions and administrative and technical requirements for the construction and operation of incineration plants and co-incineration plants dealing with solid or liquid waste, as regards the territory of the Republic of Bulgaria.These rules are established in order to prevent, reduce and/or limit the pollution of the environment, including the emissions deriving form incineration activities (including harmful substances) and discharged in the ambient air, soils, surface and groundwater, also in relation to the risk to human health.The list of exceptions is stipulated in the article 2.The Annex is also part of this publication (list of emission limit values for harmful substances in ambient air).
Amended by: Regulation amending the Regulation No 4 of 5 April 2013 on the conditions and requirements for the construction and operation of incineration plants and co-incineration plants. (2018-10-05)